Residential Case Study
PROJECT BACKGROUND – JOHN BARKER PLACE HITCHIN



Project Background
-
Phase 1 features a three to five-storey red-brick block of retirement living apartments and a supermarket and food takeaway unit. Phase 2, scheduled to begin in Spring 2022, will be predominantly buff and grey bricks, is a mix of 83 affordable housing and open market units. Phase 3, involves replacing the whole of Freemans Close with 32 one and two-bed apartments, 14 three-bedroom houses and a children’s play area.
- YELOfon HD10+ is the acclaimed resilient layer system that carries 3 proprietary Robust Details: E-FC-5, 17 & 18. The system is lightweight, easy to install and delivers unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor.
Type of Construction Hollowcore Plank Project size 4200 m2 Products Installed |
Suitable for all types of floors including concrete and screed. Lightweight and easy to install
Products Installed Information
Uncategorized