Residential Case Study

Sheldon Court, East Birmingham

Project Background

Sheldon Court is a development comprising of 64 affordable 1 and 2 bedroom apartments. All apartments have a modern finish that deliver light-filled living spaces, with an eye-catching bold, architectural window-lined façade. With good public transport to Birmingham airport and city centre. The apartments also have 60 parking spaces of which some have electric charging points for electric vehicles.

Cellecta’s HiDECK Acoustic Overlay 28 was specified by Elevate Property Group due to its high sound reduction performance, protecting sound in gym areas and entertainment areas getting into guest rooms. This highly conductive structural floorboard has rapid heat transfer characteristics enabling a more efficient under floor heating system.

Centrick Property was awarded this 3,500m² contract to construct this development in East Birmingham.

Architect

Elevate Property Group

Contractor

Centrick Property

Type of Construction

Residential

Project size

3,500m²

Products Installed

  HiDECK Acoustic Overlay 28

 

DOWNLOAD PDF

HiDECK Acoustic Overlay 28 features edge detailing not requiring screws making it quick and efficient to install”

Products Installed Information