Commercial Case Study
Hartham Leisure Centre, Hertford
Project Background
Hartham Leisure Centre scheme comprises of a refurbishment and two-storey extension as part of the East Herts Council’s investment in leisure. The centre now includes a gym, modern studios, soft play areas, and a café area. This refurbishment and extension have not only enhanced the centre’s aesthetic appeal and functionality but also solidified its position as a leader in sustainability and commitment to a greener future.
Cellecta’s HEXATHERM XFLOOR 300 was specified by Saunders Boston Architects due to its high resistance to compression and closed cell structure that provides unrivalled resistance to water absorption, making them ideal for a multitude of domestic, commercial, and educational applications.
Cadman Construction was awarded this 500m² contract for this BREEAM build in Hertford.
Architect Saunders Boston Architects Contractor Cadman Construction Type of Construction Commercial Project size 500m² Products Installed
|
“High compressive strength, extruded polystyrene thermal floor insulation boards”
Products Installed Information
Thermal