Residential Case Study

Wey Hill, Surrey

Project Background

Wey Hill is a three-story building accommodating eight apartments located in Haslemere in the borough of Waverley in Surrey. Demolition of the existing warehouse was authorised to build this 570m² development, consisting of two one bedroom and six two bedroom apartments, located 12 miles from Guildford.

 

Cellecta’s Mojave S2-10 was specified by Landmark Estates for its high-performance underfloor heating system that offers a dry and robust floor build-up from one source. XFLO FF boards are manufactured to suit the pipe diameter and spacing required to achieve the desired thermal output.

 

Vero Developments were awarded the contract to erect this development.

Architect

Landmark Estates

Contractor

Vero Developments

Type of Construction

Residential

Project size

570m²

Products Installed

Mojave S2-10

YELOfon HD10+

DOWNLOAD PDF

“Superior impact sound deadening properties when using YELOfon HD10+”

Products Installed Information

Uncategorized

Cellecta Pro Adhesive

Uncategorized

Mojave S2-10

Uncategorized

YELOfon ES5

Uncategorized

YELOfon HD10+