Commercial Case Study

Sandy Park Hotel, Exeter

Project Background

Sandy Park is a four-star Courtyard by Marriott Hotel. At nine-storeys, the L-shaped hotel will feature leisure facilities on the ground floor and a restaurant on the top floor. The development comprised of the demolition of a bungalow to construct a 250 bedroom hotel, which has access to the existing Sandy Park rugby club stadium complex via a footbridge. The new hotel site is situated alongside the M5 to the south of the main stadium car park adjacent to Old Rydon Lane.

Cellecta’s HiDECK Overlay 18 was specified by Sigmat in this project as the overlay flooring solution. It’s ideal for flooring applications incorporating an underflooring heating system due to its high thermal conductivity which provides rapid reaction times, saving on running costs. In addition, its high density makes it perfect for a variety of acoustic applications.

DNA Integrated Construction was awarded this 24,000m² contract to construct this development in Exeter.

Architect

Sigmat

Contractor

DNA Integrated Construction

Type of Construction

Commercial

Project size

24,000m²

Products Installed

  HiDECK Overlay 18

  HEXATHERM XFLOOR 250

  FIBREfon 10

DOWNLOAD PDF

“Suitable for all types of steel, concrete and timber floors”

Products Installed Information

Uncategorized

HEXATHERM XFLOOR 250

Uncategorized

HiDECK Overlay 18