Residential Case Study

PROJECT BACKGROUND – HARBOUR CENTRAL, LONDON

Project Background

Harbour Central is a brand new development in London’s Docklands, comprising a total of 642 private apartments divided across five residential buildings, along with a leisure complex. One, two and three bedroom apartments along with eight  penthouse apartments, only minutes from canary wharf.

Our YELOfon HD10+ was installed in this development for is unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor. This product also works in conjunction with underfloor heating.

Type of Construction

Residential, London

Project size

30,000m²

Products Installed

   YELOfon HD10+

 

YELOfon HD10+ is lightweight and easy to install.

Products Installed Information

Uncategorized

YELOfon HD10+