Residential Case Study

PROJECT BACKGROUND – OLYMPUS HOUSE

Project Background

This development consists of one and two bedroom apartments in Olympus House at Old Railway Quarter, Swindon. This is an ideal location, with multiple amenities on the door step such as shopping at the nearby outlet center, restaurants and landscaped gardens.

 

 

Our YELOfon HD10+ was installed in this development for its unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor. This product is lightweight making it easy to install, also YELOfon HD10+ is delivered in rolls to ensure its easy to handle.

Type of Construction

Residential, Swindon

Project size

5000 m²

Products Installed

   YELOfon HD10+

 

Lightweight and easy to install

Products Installed Information

Uncategorized

YELOfon HD10+