Residential Case Study
PROJECT BACKGROUND – OLYMPUS HOUSE



Project Background
This development consists of one and two bedroom apartments in Olympus House at Old Railway Quarter, Swindon. This is an ideal location, with multiple amenities on the door step such as shopping at the nearby outlet center, restaurants and landscaped gardens.
Our YELOfon HD10+ was installed in this development for its unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor. This product is lightweight making it easy to install, also YELOfon HD10+ is delivered in rolls to ensure its easy to handle.
Type of Construction Residential, Swindon Project size 5000 m² Products Installed |
|
Lightweight and easy to install
Products Installed Information
Uncategorized