Commercial Case Study

PROJECT BACKGROUND – THYTERINGTON HOTEL, MACCLESFIELD

Project Background

This 4 star hotel saw the refurbishment of its club and the development of 65 bedrooms. The Tytherington is situated 3.7 miles from Adlington Hall, with Manchester airport only 8.1 miles away.

2,000m2 of ScreedBoard 28 was installed into this development. ScreedBoard 28 is suitable for all floor types and is frequently viewed as the solution of choice for new build and refurbishment developments. with its interlocking edges for installation convenience, high density and unique resilient layer it provides unrivalled acoustic performance.

Type of Construction

Hotel, Macclesfield 

Project size

2,000m²

Products Installed

   ScreedBoard 28

 Flanking strip

 

Award winning ScreedBoard removes the drying times associated with wet screeds

Products Installed Information