Commercial Case Study

Bermondsey Spa, Southwark

Project Background

Bermondsey Spa is a transformation of a neglected corner of south London into one with well designed homes, streets, spaces, and places for the local community. Located in Southwark, close to Tower Bridge and Bermondsey Underground station. 2,000 new homes, 40% of which are affordable housing, have been created. 16 GP surgeries in two new health centres, a NHS dental practice, pharmacy, youth, and play facilities, 2.5 hectares of re-landscaped open space, bicycle parks, council offices and a One Stop Shop, shops, including a food retail store, and offices for the Southwark Primary Care Trust have been constructed.

Cellecta’s YELOfon HD10+ was specified by Levitt Bernstein for this development for its acclaimed resilient layer which isolates floating screed from the structural concrete floor. YELOfon HD10+ has superior impact sound deadening properties, is light weight and is easy to handle and install.

Hyde Group was awarded this 25,000m² contract to construct this development in one of the most vibrant places to live in London.

Architect

Levitt Bernstein

Contractor

Hyde Group

Type of Construction

Commercial

Project size

25,000m²

Products Installed

  YELOfon HD10+

 

DOWNLOAD PDF

YELOfon HD10+ is a high performance sound proofing layer with outstanding features”

Products Installed Information

Uncategorized

YELOfon HD10+