Residential Case Study

The Dairy, Tunbridge Wells

Project Background

The Dairy is a retirement Living Plus development built in 2017 for people over the age of 70. Providing both one and two bedroom apartments, each apartment has a fully fitted kitchen, underfloor heating, fitted and tiled shower room with level access shower and a 24 hour emergency call system. Facilities include a hair and nail salon, lifts to all floors, club lounge, restaurant and a south facing courtyard garden. Transport links to surrounding towns and cities are available via rail and road. The railway station has trains running directly to Charing Cross and London Bridge which takes one hour.

 

Cellecta’s Mojave S1-8 was specified by Lewis & Hickey due to it being a lightweight option for an acoustic composite floor build up. This system has a low energy use, reducing running costs and co2 emissions, which benefits the environment.

 

McCarthy & Stone were awarded this 2,860m² contract to construct this development on St John’s Road in Royal Tunbridge Wells.

Architect

Lewis & Hickey

Contractor

McCarthy & Stone

Type of Construction

Residential

Project size

2,860m²

Products Installed

  Mojave S1-8

DOWNLOAD PDF

“The Mojave S1-8 is suitable for all concrete, steel and timber floors”

Products Installed Information