Residential Case Study

Haydons Road, Wimbledon

Project Background

Haydons Road is a block of 8 purpose-built flats consisting of seven one beds, and one two beds arranged in two interlinked blocks. The front block includes six flats over three floors with two further flats to the rear block over two. This development is located within walking distance of Haydons Road station and offers regular links into central London.

 

Cellecta’s Mojave S2-8 was specified by Papa Architects as it offers a dry and robust floor build up from one source. Mojave S2-8 is a high-performance underfloor heating system which performs at a low flow temperature. XFLO FF boards are manufactured to suit the pipe diameter and spacing required to achieve the desired thermal output.

 

Caldera Construction was awarded this 100m² contract for this development in Wimbledon.

Architect

Papa Architects

Contractor

Caldera Construction

Type of Construction

Residential

Project size

100m²

Products Installed

  Mojave S2-8

DOWNLOAD PDF

Mojave has excellent acoustic resilience, and is also a best services product from Cellecta”

Products Installed Information

Uncategorized

Cellecta Pro Adhesive

Uncategorized

Mojave S2-8

Uncategorized

YELOfon ES5