Commercial Case Study

Transport Hub, Porth

Project Background

Porth Transport Hub is an integrated bus and rail interchange part of the Porth Regeneration Strategy located at the existing railway station. The hub is modern and attractive at the heart of the Town Centre, providing seamless travel across bus and rail. The development saw demolition of three buildings to include electric vehicle charging points, a taxi rank, cycle stores and several upgrades across the local Active Travel network.

 

Cellecta’s HEXATHERM XFLOOR 300 was specified by Redstart due to its high resistance to compression and closed cell structure that provides unrivalled resistance to water absorption, making them ideal for a multitude of domestic, commercial, and educational applications.

 

Encon Construction in partnership with Rhondda Cynon Taf Council was awarded this 530m² contract for this development in Porth.

Architect

Redstart

Contractor

Encon Construction

Rhondda Cynon Taf Council

Type of Construction

Commercial

Project size

530m²

Products Installed

  HEXATHERM XFLOOR 300

DOWNLOAD PDF

“High compressive strength, extruded polystyrene thermal floor insulation boards”

Products Installed Information

Uncategorized

HEXATHERM XFLOOR 300