Project Background
The Wharf consists of 200 one, two, or three bedroom social housing apartments, with some featuring balconies and Juliet balconies. Alongside this development, a shop and a coffee shop are located on the ground floor, along with parking and bike racks. The site was formally known as The Wharf pub, which was demolished in 2016. Permission was granted for signs reading ‘The Wharf’ to be installed on some of the blocks of flats, which have been split into different blocks around the site, varying between three and seven storeys.
Cellecta’s ScreedBoard 28 was specified by Morgan2Morgan Architects due to it being suitable for all floor types and is frequently viewed as the solution of choice for new build and refurbishment developments. Its interlocking edges for installation convenience, high density, and unique resilient layer provides unrivalled acoustic performance.
Willis Construction was awarded this 5,000m² contract for this development in Cardiff Bay.
Architect Morgan2Morgan Architects Contractor Willis Construction Type of Construction Residential Project size 5,000m² Products Installed |
“ScreedBoard 28 has interlocking edge detail – no screws required”
Products Installed Information
Acoustic
Ancillaries