Residential Case Study
Lucy Cavendish College, Cambridge
Project Background
Aris House is a brand-new four-story building accommodating 15 one and two bedroom apartments, a passenger lift to all floors, and allocated parking spaces. A specification of 163m² was authorised to this development located in a landmark position on the bustling Highcliffe High Street.
Cellecta’s insuBEAM was specified by ARC Architecture Ltd due to its weight saving and quick installation benefits. The system low emissivity foil faced insulation blocks are manufactured to the highest possible specification helping achieve the required U-Value. insuBEAM systems are fully supplied in plot specific quantities reducing waste and transport to site. The system is 42% less CO2 compared to a traditional beam and block system without the transport emissions being included.
CBS BUILD was awarded the contract to erect this new development.
Architect ARC Architecture Ltd Contractor CBS BUILD Type of Construction Residential Project size 163m² Products Installed
|
“The low CO2, high thermal performance beam and insulation block system”
Products Installed Information
Suspended Ground Floor