Residential Case Study

PROJECT BACKGROUND – FORMER REDLAND SCHOOL: BRISTOL

Project Background

Redland Court The Development
An exceptional development of the former Redland High School. Forming a collection of architecturally unique buildings to create a stunning new community of 1,2 and 3 bedroom apartments and houses. An exquisite house over two floors with open plan living area, additional mezzanine living space and roof terrace.

Our dry laid underfloor heating system, Mojave, was installed in this project, Mojave can be installed on various types of floor, concrete, steel and timber. Mojave also has low energy use reducing this systems running cost and co2 emissions. This alongside its outstanding acoustic performance makes it the ideal dry laid unfloor heating system for various applications.

ScreedBoard 20 was used due to the underfloor heating applications , with ScreedBoard being 3x more thermnally conductive than chipboard , it is the ideal overlay floorboard.

Type of Construction

Solid timber joists

Project size

600m²

Products Installed

   ScreedBoard 28

ScreedBoard 20

DECKfon 37T & Quattro 39

Mojave S1-8

XFLO-FF

                                                                 

                                                                        Mojave- ‘Best Services Product’ house builder product awards 2020

Products Installed Information

Uncategorized

Mojave S1-8

Screedboard

ScreedBoard 20

Uncategorized

ScreedBoard 28

Uncategorized

XFLO-FF