Residential Case Study

South Norwood Hill, Croydon

Project Background

This development consist of 9 1,2 and 3 bedroom flats. All ,either have a private garden or balcony.  Located within a short walk from Crystal Palace and Norwood Junction station – with direct trains taking 17 minutes into London.

Our YELOfon HD10+ was used as an under screed layer, this light weight system is  easy and quick to install. YELOfon HD10+ can also be used in conjunction with underfloor heating.

Type of Construction

Residential, London

Project size

500 m²

Products Installed

   YELOfon HD10+

 

YELOfon HD10+ is the uk’s No.1 high performance under screed resilient layer

Products Installed Information

Uncategorized

YELOfon HD10+