Residential Case Study
South Norwood Hill, Croydon



Project Background
This development consist of 9 1,2 and 3 bedroom flats. All ,either have a private garden or balcony. Located within a short walk from Crystal Palace and Norwood Junction station – with direct trains taking 17 minutes into London.
Our YELOfon HD10+ was used as an under screed layer, this light weight system is easy and quick to install. YELOfon HD10+ can also be used in conjunction with underfloor heating.
Type of Construction Residential, London Project size 500 m² Products Installed |
|
YELOfon HD10+ is the uk’s No.1 high performance under screed resilient layer
Products Installed Information
Uncategorized